logo
logo
  • About
    • about the company
    • history of the company
    • Enterprise policy, certificates, awards
    • Team
    • Patners
  • Water supply
  • Wastewater disposal
  • Laboratory control
    • Drinking water laboratory control
    • Rainwater wastewater laboratory control
    • Domestic waste water laboratory control
    • Bottled water quality control
  • Ecology
    • Environmental management system
    • Water resources protection and rational use
    • Atmospheric air protection
    • Production waste management
  • Connection
    • The procedure for concluding contracts
    • The procedure for connecting to engineering systems
    • Tariffs and fines
    • Legal acts and technical legal acts (legal acts on waste water intake, water supply, etc.)
    • Metering devices
    • Technical specifications
    • Excavation work permit
    • Acceptance of objects for operation
    • Coordination of project solutions
  • Services
    • Wastewater disposal
    • Technical Supervision
    • Periodic inspection of fire hydrants with measurement of their flow pressure
    • Road surfaces cleaning
    • Green spaces watering
    • Water supply
    • Technical specifications
    • Sanitation and flushing of water supply networks
    • Reception of household waste water by tank trucks
    • Testing of pipelines of domestic and drinking water supply for strength (tightness)
    • Analytical control in the field of environmental protection
    • Bottled water service
  • DRINKING WATER
    • CATALOG OF PRODUCTS AND SERVICES
    • Production
    • Clients
    • FAQ
    • Order Placing
    • Payment methods
    • TERMS OF DELIVERY
    • Entering into a contract
  • Contacts
EN
RU
EN
CHN
Phone: +375 17 591 01 03
Email: info@greatwater.by
Request a call

Как к вам обращаться?
Контактный телефон *
This field is required
Go check:*
Field test on the robot must be filled.
Send a message

Как к вам обращаться? *
This field is required
The text of the message *
This field is required
Go check:*
Field test on the robot must be filled.

Metering devices

Home
| Connection
| Metering devices

Metering units (metering and pressure devices) are located in wells (chambers) on the user’s networks at the balance border of water disposal networks (utility, rainwater drainage) or at the border of the operational responsibility of the user and the operating organization - UE Water Systems of the Industrial Park, if other is not listed in the water disposal agreement or agreed during the development of the project with the operating organization UE “Water Systems of the Industrial Park”. At the same time, in order to provide sampling procedures, the installation of a flow meter in the control well is not allowed.

When mounting flow meters in wells (chambers), proper devices shall be used (designed to work in flooded chambers. At the same time, remote parameter data transfer (flow, pressure) must be provided without dispatching supervisors to chambers.

 

Metering and pressure devices installed at the facility's connections to external water supply and sewerage networks must meet the following requirements for the design and installation of metering devices:



For pressure pipelines

Specifications for the design of water metering units and technical requirements for metering devices.

Requirements for the design and installation of metering and pressure devices are attached to the technical specifications for water supply and sewerage systems of the industrial park;



For free-flow pipelines

Specifications for the design of wastewater metering units and technical requirements for metering devices.
Requirements for the design and installation of metering and pressure devices are attached to the  technical specifications  for water supply and sewerage systems of the industrial park;

The procedure for organizing data transfer from metering devices installed on the networks of the utility and drinking water supply, utility and rainwater drainage systems.

When developing a project, data transfer from metering and pressure devices should be provided through 2 communication channels.

At the first stage, during the commissioning of the facility, ensure the transmission of data via GSM communication (channel No. 1) to the existing Scada system Vijeo Citect 2015, ver.7.5 physically installed at the site “Engineering infrastructure of the launch zone of the priority development area of the Chinese-Belarusian Industrial Park. Wastewater treatment plant site ”.

At the second stage - after the commissioning of the fiber-optic (backbone) communication line of the park - transfer the data transmission over the Ethernet network (channel No. 2).

When choosing equipment for data collection cabinets, provide presence of standardized data transfer protocols (for example, modbus TCP) or developed OPC servers for integration into the Vijeo Citect 2015 Scada system.

Provide expansion of I / O points for the existing SCADA system based on the number of required metering devices (including pressure sensors), but not less than 5 units for each device (sensor). The design solution should provide for the entire set of maintenance works..

  • Channel No. 1

At the first stage, transfer data to:

- to the existing Scada system Vijeo Citect 2015, ver.7.5 physically installed at the site “Engineering infrastructure of the launch zone of the priority development area of the Chinese-Belarusian Industrial Park. Wastewater treatment plant site ”.;

- to the e-mail of the organization operating the external water supply networks - UE "Water Systems of the Industrial Park"- gdanovich@greatwater.by;

- to the e-mail of the organization operating the intra-quarter water supply networks of the facility - to be determined during the commissioning;

- to the e-mail of the organization servicing this device (in case of transfer of service by the owner of the metering device to outsourcing or a backup e-mail remains) - to be determined during the commissioning.

- transmission of SMS-messages (in emergency mode) - the phone number is specified during the of commissioning;

from metering devices installed on the utility and rainwater drainage network to the e-mail of organizations (similar to the devices in the utility and drinking water supply network).

  • Channel No. 2

To prepare the second stage of data transmission, provide for the installation in the nearest distribution point (determined at the stage of the construction project) of the necessary equipment for data transmission:

- to organize a communication channel for data transmission from the projected metering devices of water supply and water disposal systems to the backbone communication network of the industrial park, provide laying of a cable with optical fibers from the metering devices to the distribution point.

- at the distribution point, connect to the optical cross-section of the backbone communication network of the industrial park.

-data transfer protocol - an open industrial Ethernet protocol (TCP / IP) with the final data transfer to the control center of the Water Systems Industrial Park UE - the existing Scada system Vijeo Citect 2015, ver.7.5 (Wastewater treatment plant site).

Before the construction of the backbone network of the industrial park, channel 1 will be the main one, after the completion of the work on the creation of the backbone network, channel 1 will become a backup, channel 2 becomes main one.

When choosing a brand of metering devices, please take into consideration that data collection (flow, pressure, temperature, etc.) is provided in a single dispatch center in the dispatcher's SCADA system, and data transmission must be provided via the Modbus protocol (RS485 data network, Ethernet, GSM communication) to the site of the wastewater treatment plant (through the backbone communication network of the park). Supplier is obliged to provide a table indicating the storage addresses of the "Address-Parameter" variables for the equipment.

When using data transfer protocols other than industrial standardized protocols, the equipment supplier is obliged to provide a developed OPC server with a table of addresses for storing the "Address-Parameter" variables..

Adding of one flow meter must be accompanied by the expansion of SCADA system I / O points with at least 20 pieces of I / O signals for each meter and pressure sensor.

logo
Карта сайта
Unitary enterprise "Water Systems of the Industrial Park" is registered in the unified state register of legal entities and individual entrepreneurs under the number 691700296 of 06/26/2017 by the State Institution "Administration of the China-Belarus Industrial Park" Industrial Park "Great Stone".

The online store www.greatwater.by is registered in the Trade Register of the Republic of Belarus under number 471230 of 01/20.2020