The enterprise issues a certificate on the fulfillment of technical conditions for the sections of water supply and sewerage and the provision of the facility with water supply and sewerage services.
To obtain a certificate on the fulfillment of technical conditions for the design of water supply and sewerage sections for the facility, the contractor in any written form applies to the Unitary Enterprise “Water Systems of the Industrial Park”.
The certificate is issued free of charge. The term for issuing a certificate is 2 working days.
Prior to the preparation of a certificate on the implementation of the technical conditions, the employees of the unitary enterprise "Water Systems of the Industrial Park" in the presence of the customer's representative carry out at the facility the technical acceptance of the sections of the water supply / sewerage networks connected to the centralized water supply / sewerage system of the industrial park.
During technical acceptance, sections of the network and objects of water supply and sewerage systems are assessed according to the following criteria:
- compliance of the construction, installation, commissioning works performed at the facility with the requirements of the Technical Specifications , issued by the enterprise for water supply, water disposal and rainwater drainage for the facility;
- design and brand of metering and pressure devices that meet technical requirements.