When carrying out excavation works on the territory of an industrial park, the contractors must be guided by executive surveys of existing engineering networks of water supply and sanitation systems.
In the places where the existing underground utilities pass, excavation works are carried out strictly after issuing a permit for earthworks and in the presence of company representatives.
Before starting excavation work, a construction organization must obtain a permit for it.
To obtain a permit, the customer sends a letter to the enterprise on obtaining a permit for earthworks near water supply / sewerage communications with the details and email address by fax +375 (17) 591-01-02 or by e-mail info@greatwater.by indicating the works location, possible date and time period of works.
The enterprise, during the working day, in case of a positive decision, draws up a permit for earthworks. The permit is signed by representatives of both parties.
The permit is recorded in the "Journal of registration of letters for the production of earthworks", which is kept at the enterprise..