logo
logo
  • About
    • about the company
    • history of the company
    • Enterprise policy, certificates, awards
    • Team
    • Patners
  • Water supply
  • Wastewater disposal
  • Laboratory control
    • Drinking water laboratory control
    • Rainwater wastewater laboratory control
    • Domestic waste water laboratory control
    • Bottled water quality control
  • Ecology
    • Environmental management system
    • Water resources protection and rational use
    • Atmospheric air protection
    • Production waste management
  • Connection
    • The procedure for concluding contracts
    • The procedure for connecting to engineering systems
    • Tariffs and fines
    • Legal acts and technical legal acts (legal acts on waste water intake, water supply, etc.)
    • Metering devices
    • Technical specifications
    • Excavation work permit
    • Acceptance of objects for operation
    • Coordination of project solutions
  • Services
    • Wastewater disposal
    • Technical Supervision
    • Periodic inspection of fire hydrants with measurement of their flow pressure
    • Road surfaces cleaning
    • Green spaces watering
    • Water supply
    • Technical specifications
    • Sanitation and flushing of water supply networks
    • Reception of household waste water by tank trucks
    • Testing of pipelines of domestic and drinking water supply for strength (tightness)
    • Analytical control in the field of environmental protection
    • Bottled water service
  • DRINKING WATER
    • CATALOG OF PRODUCTS AND SERVICES
    • Production
    • Clients
    • FAQ
    • Order Placing
    • Payment methods
    • TERMS OF DELIVERY
    • Entering into a contract
  • Contacts
EN
RU
EN
CHN
Phone: +375 17 591 01 03
Email: info@greatwater.by
Request a call

Как к вам обращаться?
Контактный телефон *
This field is required
Go check:*
Field test on the robot must be filled.
Send a message

Как к вам обращаться? *
This field is required
The text of the message *
This field is required
Go check:*
Field test on the robot must be filled.

Excavation work permit

Home
| Connection
| Excavation work permit

When carrying out excavation works on the territory of an industrial park, the contractors must be guided by executive surveys of existing engineering networks of water supply and sanitation systems.

In the places where the existing underground utilities pass, excavation works are carried out strictly after issuing a permit for earthworks and in the presence of company representatives.

Before starting excavation work, a construction organization must obtain a permit for it.

To obtain a permit, the customer sends a letter to the enterprise on obtaining a permit for earthworks near water supply / sewerage communications with the details and email address by fax +375 (17) 591-01-02 or by e-mail info@greatwater.by indicating the works location, possible date and time period of works.

The enterprise, during the working day, in case of a positive decision, draws up a permit for earthworks. The permit is signed by representatives of both parties.

The permit is recorded in the "Journal of registration of letters for the production of earthworks", which is kept at the enterprise..


logo
Карта сайта
Unitary enterprise "Water Systems of the Industrial Park" is registered in the unified state register of legal entities and individual entrepreneurs under the number 691700296 of 06/26/2017 by the State Institution "Administration of the China-Belarus Industrial Park" Industrial Park "Great Stone".

The online store www.greatwater.by is registered in the Trade Register of the Republic of Belarus under number 471230 of 01/20.2020
222210, Republic of Belarus, Minsk region, Smolevichi district, China-Belarus Industrial Park "Great Stone", Pekinskiy ave, 18
Working hours of the online store Monday-Friday 8:30 - 17:00

Log In Register
Cart0 items
Total price Br0